DuPont vs Pitman: Which 12-Hour Schedule Should You Run?
Two of the most famous 24/7 patterns share the same skeleton — four crews, 12-hour shifts, a 42-hour weekly average — and disagree about everything else. The DuPont schedule bets on long breaks; the Pitman schedule bets on stable rhythm. Choosing between them is choosing which bet your team would take.
The DuPont cycle (each crew rotates through nights and days)
Try the rotation
Pick a start date to map the rotation onto real weeks. Team A starts the cycle on day 1; the other teams are staggered so cover never drops.
| Mon | Tue | Wed | Thu | Fri | Sat | Sun | Mon | Tue | Wed | Thu | Fri | Sat | Sun | Mon | Tue | Wed | Thu | Fri | Sat | Sun | Mon | Tue | Wed | Thu | Fri | Sat | Sun | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Team A | Night | Night | Night | Night | Off | Off | Off | Day | Day | Day | Off | Night | Night | Night | Off | Off | Off | Day | Day | Day | Day | Off | Off | Off | Off | Off | Off | Off |
| Team B | Day | Day | Day | Off | Night | Night | Night | Off | Off | Off | Day | Day | Day | Day | Off | Off | Off | Off | Off | Off | Off | Night | Night | Night | Night | Off | Off | Off |
| Team C | Off | Off | Off | Day | Day | Day | Day | Off | Off | Off | Off | Off | Off | Off | Night | Night | Night | Night | Off | Off | Off | Day | Day | Day | Off | Night | Night | Night |
| Team D | Off | Off | Off | Off | Off | Off | Off | Night | Night | Night | Night | Off | Off | Off | Day | Day | Day | Off | Night | Night | Night | Off | Off | Off | Day | Day | Day | Day |
The Pitman fortnight (fixed day crews A/B, fixed night crews C/D)
Try the rotation
Pick a start date to map the rotation onto real weeks. Team A starts the cycle on day 1; the other teams are staggered so cover never drops.
| Mon | Tue | Wed | Thu | Fri | Sat | Sun | Mon | Tue | Wed | Thu | Fri | Sat | Sun | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Team A | Day | Day | Off | Off | Day | Day | Day | Off | Off | Day | Day | Off | Off | Off |
| Team B | Off | Off | Day | Day | Off | Off | Off | Day | Day | Off | Off | Day | Day | Day |
| Team C | Night | Night | Off | Off | Night | Night | Night | Off | Off | Night | Night | Off | Off | Off |
| Team D | Off | Off | Night | Night | Off | Off | Off | Night | Night | Off | Off | Night | Night | Night |
Side by side
| DuPont | Pitman | |
| Cycle | 28 days, mixed day/night blocks | 14 days, one shift type per crew |
| Signature feature | 7 consecutive days off every month | Every other weekend off, forever |
| Day/night arrangement | Every crew works both within each cycle | Fixed: two day crews, two night crews |
| Longest run | 4 consecutive shifts (incl. 4 nights) | 3 consecutive shifts |
| Sleep stability | Low — switches inside the cycle | High — one rhythm per crew |
| Heaviest week | 72 hours | 48 hours |
| Weekly average | 42 h | 42 h |
Choose DuPont if…
Your team treats the monthly week off as sacred — FIFO-adjacent cultures, long-commute workforces, and crews who travel on breaks consistently vote DuPont. You can absorb 72-hour weeks operationally, and your fatigue controls genuinely protect the four-night block.
Choose Pitman if…
Stability wins votes: parents and fixed-commitment lives prefer knowing their weekends a year ahead and keeping one sleep schedule. You can recruit (or fairly compensate) permanent night crews — that's the pattern's one structural demand. Most teams that vote, vote Pitman; most teams that switched to DuPont did it specifically for the week off.
The verdict
Default to Pitman for its gentler runs and guaranteed weekends; switch your shortlist to DuPont only if the monthly 7-day break is the thing your specific team names first. And either way, put both one-pagers in front of the crew — this comparison is precisely the kind of decision that should end in a vote, not a memo.